🏢 Caban Heli – Compliance Documents
This section provides access to all statutory and operational compliance documentation for Caban Heli, a multi‑use facility owned by Plas Heli Cyf. The building supports several users through licence arrangements and planned development, including:
- Derwen – educational areas used daily by learners with additional needs.
- Sea Jay Marine – occupying the Stiwdio under licence for marine‑related work.
- Future Retail/Commercial Units – proposed conversion of the former showers/toilets into four small units (planning application submitted).
All compliance documentation published here applies to the building as a whole and supports safe, lawful, and consistent operation for every user group.
Caban Heli Compliance Sections
The following categories of compliance documentation are being digitised and published here:
🔥 Fire Safety Compliance
Fire safety documentation including alarm tests, extinguisher servicing, emergency lighting checks, and evacuation arrangements.
Open Fire Safety⚡ Electrical Safety Compliance
Electrical compliance documentation including EICR, PAT testing, distribution board schedules, and contractor inspection notes.
Open Electrical Safety🔥 Gas Safety Compliance
Annual gas safety certification, appliance servicing, and installation records for Caban Heli.
Open Gas Safety🚿 Legionella Management (Overview)
Water safety documentation including flushing logs, temperature monitoring, and control measures.
Open Legionella Compliance Overview🧪 Legionella Risk Assessment (Full Signed Version)
The full Legionella Risk Assessment for Caban Heli, including system description, hazard identification, risk evaluation, and control measures.
Open Legionella Risk Assessment📝 Risk Assessments
Building, operational, contractor, and area‑specific risk assessments for Caban Heli.
Risk Assessment content will be added as documents are digitised.
📄 Insurance & Statutory Certificates
Public liability, employer’s liability, and statutory certificates relating to Caban Heli.
Insurance documentation will be added as digitisation progresses.
🏢 Tenant & Operational Arrangements
Operational arrangements relating to Derwen and Sea Jay Marine, including access, responsibilities, and building‑use protocols.
Additional documents may be added as tenancy arrangements evolve.
📦 Additional Caban Heli Sections (Coming Soon)
The following sections will be added as the Caban Heli documentation expands:
- Insurance & Licensing
- Contractor Access & Controls
- Maintenance Logs
How These Documents Support Caban Heli
Together, these compliance sections provide a complete framework for:
- Safety – electrical, gas, fire, and water systems
- Compliance – statutory and landlord obligations
- Operations – tenant responsibilities and building use
- Risk Management – Legionella, inspections, and monitoring
This structure ensures clarity, consistency, and compliance across all activities within Caban Heli.
Document Control
Document Title: Caban Heli – Compliance Documents
Version: 2.0 (Unified Page + Full Accordion Structure)
Review Cycle: Annual or post‑major change
Plas Heli is currently converting paper‑based compliance documents into digital format for convenience and long‑term accessibility. Some documents may not yet be available or may temporarily link to placeholder pages.
If you urgently require a specific certificate, policy, or compliance document, please contact the Plas Heli office.